Commissioning

From ICRPaedia
Revision as of 19:42, 11 August 2021 by Charlotte White (talk | contribs) (Created page with "100px|frameless|right|link=ICRP Glossary Testing carried out after new equipment has been installed in order to verify that the equipment is prope...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Glossary Icon-2.png

Testing carried out after new equipment has been installed in order to verify that the equipment is properly configured for its clinical application at the centre (NCRP, 2010).

(Adapted from ICRP Publication 120, 2012)

Return to Glossary

Previous glossary entries