Difference between revisions of "Acceptance test"

From ICRPaedia
Jump to navigation Jump to search
(Created page with "A test carried out after new equipment has been installed or major modifications have been made to existing equipment, in order to verify compliance with the manufacturer’s...")
 
 
Line 1: Line 1:
 
A test carried out after new equipment has been installed or major modifications have been made to existing equipment, in order to verify compliance with the manufacturer’s specifications, contractual specifications, and applicable local regulations or equipment standards. ([[ICRP Publication 120]], 2012)
 
A test carried out after new equipment has been installed or major modifications have been made to existing equipment, in order to verify compliance with the manufacturer’s specifications, contractual specifications, and applicable local regulations or equipment standards. ([[ICRP Publication 120]], 2012)
  
 +
''ICRP Glossary entry -  May 2019''
  
''[[ICRP Glossary]] entry -  May 2019''
+
 
 +
'''Return to [[ICRP Glossary|Glossary]]'''

Latest revision as of 17:24, 12 September 2019

A test carried out after new equipment has been installed or major modifications have been made to existing equipment, in order to verify compliance with the manufacturer’s specifications, contractual specifications, and applicable local regulations or equipment standards. (ICRP Publication 120, 2012)

ICRP Glossary entry - May 2019


Return to Glossary